IEThe Irish Times
Tea solves infrastructure problems
Dublin-Galway tea trolley service back on a trial basis
Open original article- Ledger record
- #2525
- First seen
- 25 Aug 2026, 05:11 UTC
- Last checked
- 25 Aug 2026, 10:12 UTC
- Version history
- 1 version
- Current fingerprint
b46d82d1a1a0...a80876
01
Publisher layer
Recorded article metadata

- Publisher
- The Irish Times
- Country
- Ireland
- Source published
- 25 Aug 2026, 05:00 UTC
- Source updated
- No update timestamp supplied
- Byline
- Not supplied
- Section
- Not supplied
Source-supplied excerpt
Dublin-Galway tea trolley service back on a trial basis
02
Change layer
Observed version timeline
-
1
Tea solves infrastructure problems
Dublin-Galway tea trolley service back on a trial basis
Changed fieldstitlebylinedescriptionTextcontentTextsourcePublishedAtsourceUpdatedAtsectionimageUrltags- Version SHA-256
b46d82d1a1a0...a80876- Capture SHA-256
7ea0474718da...2f6ac7
03
Interpretation layer
Labels with declared origins
Not an adjudication.
Publisher categories are copied from source metadata. Machine signals report observable wording or format and do not determine truth, intent, ethics, or wrongdoing.
- machine content-type Reported news observable-rules-v1 / 70% rule confidence
04
Public response layer
Reception snapshots
No reviewed reception capture yet.
Comment counts and samples remain absent until a lawful, source-specific capture method is reviewed. Absence is recorded instead of estimated.
05
Evidence layer
Capture provenance
- Capture ID
- #2258
- Observed
- 25 Aug 2026, 05:11 UTC
- HTTP result
- 200 / parsed
- Raw payload
- 633,392 bytes, private gzip evidence
- Collector
- news-ledger/0.1
- Public boundary
- metadata and excerpt