IEThe Irish Times
Planning in place for 80,000 Dublin homes, but work has started on less than half
33,623 housing units were being built in second quarter of year, new report will say
Open original article- Ledger record
- #1948
- First seen
- 23 Aug 2026, 16:23 UTC
- Last checked
- 24 Aug 2026, 09:55 UTC
- Version history
- 1 version
- Current fingerprint
34608a24afc5...dc7a40
01
Publisher layer
Recorded article metadata

- Publisher
- The Irish Times
- Country
- Ireland
- Source published
- 23 Aug 2026, 16:08 UTC
- Source updated
- No update timestamp supplied
- Byline
- Martin Wall
- Section
- Not supplied
Source-supplied excerpt
33,623 housing units were being built in second quarter of year, new report will say
02
Change layer
Observed version timeline
-
1
Planning in place for 80,000 Dublin homes, but work has started on less than half
33,623 housing units were being built in second quarter of year, new report will say
Changed fieldstitlebylinedescriptionTextcontentTextsourcePublishedAtsourceUpdatedAtsectionimageUrltags- Version SHA-256
34608a24afc5...dc7a40- Capture SHA-256
1327a7f7c0a1...3bd099
03
Interpretation layer
Labels with declared origins
Not an adjudication.
Publisher categories are copied from source metadata. Machine signals report observable wording or format and do not determine truth, intent, ethics, or wrongdoing.
- machine content-type Reported news observable-rules-v1 / 70% rule confidence
04
Public response layer
Reception snapshots
No reviewed reception capture yet.
Comment counts and samples remain absent until a lawful, source-specific capture method is reviewed. Absence is recorded instead of estimated.
05
Evidence layer
Capture provenance
- Capture ID
- #1670
- Observed
- 23 Aug 2026, 16:23 UTC
- HTTP result
- 200 / parsed
- Raw payload
- 876,728 bytes, private gzip evidence
- Collector
- news-ledger/0.1
- Public boundary
- metadata and excerpt