IEThe Irish Times
How quickly could Ireland have a nuclear power plant (if the Government wants one)?
Analysis, public consultations and political wrangling could make delivery a lengthy process
Open original article- Ledger record
- #1719
- First seen
- 22 Aug 2026, 05:05 UTC
- Last checked
- 23 Aug 2026, 12:23 UTC
- Version history
- 1 version
- Current fingerprint
351b26e6f4ec...d748e6
01
Publisher layer
Recorded article metadata

- Publisher
- The Irish Times
- Country
- Ireland
- Source published
- 22 Aug 2026, 05:00 UTC
- Source updated
- No update timestamp supplied
- Byline
- Caroline O'Doherty
- Section
- Not supplied
Source-supplied excerpt
Analysis, public consultations and political wrangling could make delivery a lengthy process
02
Change layer
Observed version timeline
-
1
How quickly could Ireland have a nuclear power plant (if the Government wants one)?
Analysis, public consultations and political wrangling could make delivery a lengthy process
Changed fieldstitlebylinedescriptionTextcontentTextsourcePublishedAtsourceUpdatedAtsectionimageUrltags- Version SHA-256
351b26e6f4ec...d748e6- Capture SHA-256
8d786050c982...087266
03
Interpretation layer
Labels with declared origins
Not an adjudication.
Publisher categories are copied from source metadata. Machine signals report observable wording or format and do not determine truth, intent, ethics, or wrongdoing.
- machine content-type Analysis or opinion observable-rules-v1 / 70% rule confidence
04
Public response layer
Reception snapshots
No reviewed reception capture yet.
Comment counts and samples remain absent until a lawful, source-specific capture method is reviewed. Absence is recorded instead of estimated.
05
Evidence layer
Capture provenance
- Capture ID
- #1107
- Observed
- 22 Aug 2026, 05:05 UTC
- HTTP result
- 200 / parsed
- Raw payload
- 759,049 bytes, private gzip evidence
- Collector
- news-ledger/0.1
- Public boundary
- metadata and excerpt